Forum Title: New pebble sheen - startup question
Pool is now fill. PB will come in two days for start up, is that ok? should I start the equipment to circulate water?Any suggestions???
Category: pool Post By: VICTORIA WATKINS (Bellflower, CA), 02/28/2019

It is normal for it to take a couple of days for the PB or someone with the company to come out and do their pool school.

- KELLY PAGE (El Cajon, CA), 04/10/2019

Thank you kimkats. PB came and begun the startup process by adding acid. I have been controlling ph and TA myself. ph 7.4 TA 70 CH 100 CYA 0 I would like to add chlorine now. I have some Trichlor tabs from Leslie. Can I use them if TA is in the low range. PB suggested to keep ph between 7.0 to 7.4 and TA between 70 to 100, for the fist 28 days. How many tabs should I put in the in-line stack feeder?

- LORRAINE DAY (Bellevue, WA), 03/23/2019